Powerware 9330 Installation & Operation Manual page 230

10–20 kva/25–40 kva
Table of Contents

Advertisement

UPS CABINET
POWER TERMINALS
BYPASS INPUT
TERMINAL BLOCK
AC INPUT TO UPS
PHASE A (E6)
RECTIFIER AND
PHASE B (E7)
BYPASS
PHASE C (E8)
(SINGLE INPUT)
NEUTRAL
TERMINAL
BLOCK
NEUTRAL (E12)
FRONT VIEW DETAIL
SINGLE INPUT
A ---56
DESCRIPTION:
LOCATION OF UPS CABINET TERMINALS
POWERWARE 9330 (25 kVA-- 40 kVA)
DRAWING NO:
164201300---9
REVISION:
J
Powerware 9330 (10 kVA- -40 kVA) Installation and Operation
RECTIFIER INPUT
TERMINAL BLOCK
OUTPUT
TERMINAL
BLOCK
PHASE C (E11)
AC OUTPUT TO
PHASE B (E10)
CRITICAL LOAD
PHASE A (E9)
SHEET:
DATE:
101502
164201300 Rev. N 013004
2 of 8

Advertisement

Table of Contents
loading

Table of Contents