Chapter 5 Unpacking The Router; Tools And Parts Required; Unpacking The Router; Verifying Parts Received - Juniper MX240 Hardware Manual

Ethernet services router
Hide thumbs Also See for MX240:
Table of Contents

Advertisement

Chapter 5

Unpacking the Router

Tools and Parts Required

Unpacking the Router

This chapter describes how to prepare to install the router. It discusses the following
topics:
Tools and Parts Required on page 37
Unpacking the Router on page 37
Verifying Parts Received on page 38
To unpack the router and prepare for installation, you need the following tools:
Phillips (+) screwdriver, number 2
1/2-in. or 13-mm open-end or socket wrench to remove bracket bolts from the
shipping pallet
Blank panels to cover any slots not occupied by a component
The router is shipped in a wooden crate. A wooden pallet forms the base of the crate.
The router chassis is bolted to this pallet. Quick Start installation instructions and a
cardboard accessory box are also included in the shipping crate.
The shipping container measures 21 in. (53.3 cm) high, 23.5 in. (60.0 cm) wide, and
32.5 in. (82.5 cm) deep. The total weight of the container containing the router and
accessories can range from 93 lb (42.2 kg) to 169 lb (76.7 kg).
NOTE: The router is maximally protected inside the shipping crate. Do not unpack
it until you are ready to begin installation.
Tools and Parts Required
37

Advertisement

Table of Contents
loading

Table of Contents