Cisco uBR-3x10 Hardware Installation And Cabling Manual page 97

Rf switch
Table of Contents

Advertisement

Chapter 5
Cabling the RF Switch With the Cisco uBR7246VXR CMTS
The following tables provide chassis–line card to RF switch relationships.
Table 5-6
VXR1–LC
LC1(US0–US5)
LC2(US0–US5)
LC3(US0–US5)
LC4(US0–US5)
Table 5-7
VXR3–LC
LC1(US0–US5)
LC2(US0–US5)
LC3(US0–US5)
LC4(US0–US5)
Cabling the Protect Line Cards (VXR5)
This section describes cabling the protect cable interface line cards from the Cisco uBR7246VXR router
to the RF switch.
Equipment
To cable the protect line cards, complete the following steps. Refer to
page
Step 1
Connect the cables to the upstream connectors (US0–US5) on line card–LC1 on router 5.
Secure the cables with cable wrap, as necessary, and run the cable bundles up the right side of the
Step 2
equipment rack.
Step 3
Install the cables in the PROTECT header block in the order that they were mapped. See
Step 4
Repeat
OL-1984-06
Cable Bundle Sequence for VXR1—VXR2 to Cisco uBR 3x10 RF Switches (1 and 2)
RFS Slot (Header Block) VXR2–LC
RFS-2 Slot 1 (1A–1I)
RFS-2 Slot 5 (5A–5I)
RFS-1 Slot 1 (1A–1I)
RFS-1 Slot 5 (5A–5I)
Cable Bundle Sequence for VXR3—VXR4 to Cisco uBR 3x10 RF Switches (1 and 2)
RFS Slot (Header Block) VXR4–LC
RFS-2 Slot 3 (3A–3I)
RFS-2 Slot 7 (7A–7I)
RFS-1 Slot 3 (3A–3I)
RFS-1 Slot 7 (7A–7I)
4 cable bundles (F-connector to MCX connector—multicolor)
4 header blocks (installed)
5-12.
Step 1
through
Step 3
for all the line cards in VXR5 (PROTECT).
Connecting the Cables (Cisco uBR-MC16x Card)
LC1(US0–US5)
LC2(US0–US5)
LC3(US0–US5)
LC4(US0–US5)
LC1(US0–US5)
LC2(US0–US5)
LC3(US0–US5)
LC4(US0–US5)
Cisco uBR-3x10 RF Switch Hardware Installation and Cabling Guide
RFS Slot (Header Block)
RFS-2 Slot 2 (2A–2I)
RFS-2 Slot 6 (6A–6I)
RFS-1 Slot 2 (2A–2I)
RFS-1 Slot 6 (6A–6I)
RFS Slot (Header Block)
RFS-2 Slot 4 (4A–4I)
RFS-2 Slot 8 (8A–8I)
RFS-1 Slot 4 (4A–4I)
RFS-1 Slot 8 (8A–8I)
Table 5-8
and to
Figure 5-8 on
Figure
5-11
5-8.

Advertisement

Table of Contents
loading