Unpacking Boiler; Iii. Unpacking Boiler - Burnham ALPINE Installation, Operation And Service Instructions

Alpine series condensing high efficiency direct vent gas - fired hot water boiler
Hide thumbs Also See for ALPINE:
Table of Contents

Advertisement

ii. Pre-installation & Boiler Mounting (continued)

iii. Unpacking Boiler

CaUTiOn
Do not drop boiler.
A.
Move boiler to approximate installed position.
B.
Remove all crate fasteners.
C.
Lift and remove outside container.
Figure 2D: Bottom Mounting Bracket installation / Boiler Wall Mounting
D.
E.
Figure 2E: access Panel and gasket installation
Remove boiler from cardboard positioning sleeve on
shipping skid.
WaRning
installation of this boiler should be undertaken
only by trained and skilled personnel from a
qualified service agency.
Move boiler to its permanent location.
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp080Alp105Alp150Alp210Alp285Alp399 ... Show all

Table of Contents