ii. Pre-installation & Boiler Mounting (continued)
iii. Unpacking Boiler
CaUTiOn
Do not drop boiler.
A.
Move boiler to approximate installed position.
B.
Remove all crate fasteners.
C.
Lift and remove outside container.
Figure 2D: Bottom Mounting Bracket installation / Boiler Wall Mounting
D.
E.
Figure 2E: access Panel and gasket installation
Remove boiler from cardboard positioning sleeve on
shipping skid.
WaRning
installation of this boiler should be undertaken
only by trained and skilled personnel from a
qualified service agency.
Move boiler to its permanent location.
1