Burnham ALPINE Installation, Operation And Service Instructions page 62

Alpine series condensing high efficiency direct vent gas - fired hot water boiler
Hide thumbs Also See for ALPINE:
Table of Contents

Advertisement

iX. Boiler Stacking (continued)
permissible, providing common pipe has sufficient
flow capacity to handle combined condensate
volume of stackable combination.
2. Gas Piping - Follow instructions in Section VII "Gas
Piping" of the manual for sizing and installation
of an individual boiler. When common gas piping
is sized, insure it will have adequate capacity for
combined input (GPH gas flow) of the selected
stackable boiler combination.
62
Figure 8: Stacking Boiler attachment Bracket Placement
3. Water Piping and Trim - Follow instructions in
Section VI "Water Piping and Trim" of the manual
for system piping and boiler secondary piping
selection/sizing based on combined heating
capacity and/or gross output of the selected
stackable boiler combination. Follow instructions
of Section VI "Water Piping and Trim" for each
individual boiler trim installation.
4. Electrical - Follow instructions in Section VIII
"Electrical" of the manual to wire individual boilers.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp080Alp105Alp150Alp210Alp285Alp399 ... Show all

Table of Contents