Cpvc/Pvc Venting - Burnham ALPINE Installation, Operation And Service Instructions

Alpine series condensing high efficiency direct vent gas - fired hot water boiler
Hide thumbs Also See for ALPINE:
Table of Contents

Advertisement

iV. Venting (continued)
B.

CPVC/PVC Venting

WaRning
all CPVC vent components (supplied with boiler)
must be used for near-boiler vent piping before
transitioning to Schedule 0 PVC pipe (aSTM
2665) components for remainder of vent system.
WaRning
CPVC vent components must be used within any
interior space where air cannot circulate freely,
such as air inside a stud wall, and in any boiler
closet.
Table a: CPVC/PVC Vent & air intake Components included With Boiler
Vent & air intake Components
3" Schedule 40 PVC Tee (Vent & Air Intake
Terminals)
4" Schedule 40 PVC Tee (Vent & Air Intake
Terminals)
3" Stainless Steel Rodent Screen
4" Stainless Steel Rodent Screen
3" x 30" Schedule 40 CPVC Pipe
4" x 30" Schedule 40 CPVC Pipe
3" Schedule 80 CPVC 90° Elbow
4" Schedule 80 CPVC 90° Elbow
4 oz. Bottle of Transition Cement
4 oz. Bottle of Primer
3" Vent/3" Combustion Air CPVC/PVC
Connector
3" Vent/4" Combustion Air CPVC/PVC
Connector
4" Vent/4" Combustion Air CPVC/PVC
Connector
3" Vent/3" Combustion Air CPVC/PVC
Connector Gasket
4" Vent/4" Combustion Air CPVC/PVC
Connector Gasket
Table 4B: CPVC/PVC Vent & Air Intake Components (Installer Provided) required for Optional Vertical
(Roof) Termination
Vent Components
3" Schedule 40 PVC Coupler
4" Schedule 40 PVC Coupler
3" Schedule 40 PVC 90° Elbow
4" Schedule 40 PVC 90° Elbow
3" Schedule 40 CPVC Pipe x ½ ft. min. horizontal run
4" Schedule 40 CPVC Pipe x ½ ft. min. horizontal run
aLP080 & aLP105
Part
Standard Termination
number
Vent Kit
(P/n 102189-01)
includes
102190-01
2
102190-02
N/A
102191-01
2
102191-02
N/A
102193-01
1
102193-02
N/A
102192-01
1
102192-02
N/A
102195-01
1
102194-01
1
102183-01
1
102183-02
N/A
102183-03
N/A
102185-01
1
102185-02
N/A
Part
aLP080 & aLP105
number
Vertical (Roof)
Termination
N/A
Supplied by
Others
WaRning
When using the CPVC/PVC vent options, the use
of CPVC is required when venting in vertical or
horizontal chase ways.
1. Components and Length Restrictions
a. See Table 4A for CPVC/PVC Vent & Air Intake
Components included with boiler, Table 4B for
CPVC/PVC Vent and Air Intake Components
(Installer Provided) required for Optional
Vertical (Roof) Termination and Table 4C for
CPVC/PVC Vent and Air Intake Components
(Installer Provided) required for Optional
Horizontal (Snorkel) Termination.
Quantity
aLP150 & aLP210
Standard Termination
Vent Kit
(P/n 102189-02)
includes
1
1
1
1
1
N/A
1
N/A
1
1
N/A
1
N/A
N/A
1
Quantity
aLP150 & aLP210
Vertical (Roof)
Termination
1
N/A
N/A
1
2
N/A
N/A
2
1
N/A
N/A
1
aLP285 thru aLP500
Standard Termination
Vent Kit
(P/n 102189-0)
includes
N/A
2
N/A
2
N/A
1
1
1
1
1
N/A
N/A
1
N/A
1
aLP285 thru aLP500
Vertical (Roof)
Termination
N/A
1
N/A
2
N/A
1
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp080Alp105Alp150Alp210Alp285Alp399 ... Show all

Table of Contents