Unpacking Boiler; Clearances To Combustible And Non-Combustible Material - Burnham ALP105 Installation, Operating And Service Instructions

Burnham corp. gas-fired hot water boiler installation, operating and service instructions
Table of Contents

Advertisement

Figure 2: Clearances To Combustible and non-combustible Material
iii. Unpacking Boiler
CaUTiOn
Do not drop boiler.
A.
Move boiler to approximate installed position.
B.
Remove all crate fasteners.
C.
Lift and remove outside container.
D.
Remove boiler from cardboard positioning sleeve on
shipping skid.
WaRning
installation of this boiler should be undertaken
only by trained and skilled personnel from a
qualified service agency.
E.
Move boiler to its permanent location.
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp210Alp080Alp150Alp285Alp399

Table of Contents