Required Equipment And Setup - Burnham ALPINE Installation, Operation And Service Instructions

Alpine series condensing high efficiency direct vent gas - fired hot water boiler
Hide thumbs Also See for ALPINE:
Table of Contents

Advertisement

X. Modular installation (continued)
G
. Modular Boiler Operating Information (continued)

3. Required Equipment and Setup

a. Header Sensor (p/n 103104-01)
A header sensor must be installed and wired
to the Master Sequencer "enabled" Sage2.1
Controller. The header sensor is installed on the
common system piping and provides blended
temperature information to the Sequence Master.
Refer to piping diagram Figures 41A and 42A
for installation location and Figure 48 or 49 for
installation detail.
b. RJ45 Splitters (P/N 103092-01)
RJ45 Splitters are required for installing
communications between three or more boilers.
When two boilers are connected the splitter is
not required.
c. Ethernet Cables
Ethernet cables are used to connect the boiler
network together. These are standard "straight
through" cables that can be purchased at
electrical distributors.
Alternately, the network can be wired together
by simply wiring terminal J3, Modbus 2,
terminals A, B and V- between each boiler.
Refer to Figures 35 and 36 terminal J3 for wiring
location.
Figure 50: RJ45 Splitter Installation Detail
Figure 8: Recommended "immersion" type
Header Sensor installation Detail
Figure 9: alternate "Strap-on" type Header
Sensor installation Detail
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp080Alp105Alp150Alp210Alp285Alp399 ... Show all

Table of Contents