Complete the Installation Process
(for an S8300 LSP)
Consult the planning documentation to obtain the necessary information to complete the
installation.
Part of the final process will be to:
Connect and administer test endpoints
●
Test endpoints
●
Complete the electrical installation
●
Enable adjunct systems
●
This completes the installation of the G700 Media Gateway with an S8300 LSP.
Complete the Installation Process (for an S8300 LSP)
Issue 9.1 June 2006
543