Download Print this page

Maytag MGDE201YW2 Installation Instructions Manual page 5

Gas and electric dryer

Advertisement

Available languages

Available languages

Explosion Hazard
Keep flammable
materials
and vapors, such as
gasoline, away from dryer.
Place dryer at least 18 inches (460 ram) above the floor
for a garage installation.
Failure to do so can result in death, explosion, or fire.
You will need:
[]
A location allowing for proper exhaust installation.
See "Venting Requirements."
[]
If using power supply cord, a grounded electrical outlet
located within 2 ft. (610 mm) of either side of dryer.
See "Electrical Requirements".
[]
Floor must support dryer weight of 200 Ibs. (90.7 kg).
Also consider weight of companion appliance.
[]
Cold water faucets located within 4 ft. (1.2 m) of the water fill
valves, and water pressure of 20-100 psi (137.9-689.6
kPa).
You may use the water supply for your washer using the "Y"
connector and short hose (if needed) which are provided.
[]
20-100 psi (138-690 kPa) for best performance.
[]
Level floor with maximum slope of 1" (25 mm) under entire
dryer. If slope is greater than 1" (25 mm), install Extended
Dryer Feet Kit, Part Number 279810. If not level, clothes
may not tumble properly and automatic sensor cycles may
not operate correctly.
[]
For garage installation, place dryer at least 18" (460 mm)
above floor. If using a pedestal, you will need 18" (460 mm)
to bottom of dryer.
For each arrangement,
consider allowing more space for ease
of installation and servicing; spacing for companion
appliances
and clearances for walls, doors, and floor moldings. Space
must be large enough to allow door to fully open. Add spacing
on all sides of dryer to reduce noise transfer. If a closet door
or Iouvered door is installed, top and bottom air openings
in door are required.
DRYER
DiMENSiONS
Front view:
27"
(686 ram)
353/8"
(899 mm}
Side view:
29"
(736 mrn)----------€_
Left or
right side
exhaust
31/2"
(89 ram)
(41 ram)
Door open view:
-.q
-.q
48V8"
(1238 ram)
47V8"
(1197 ram)
©

Advertisement

loading