Electrical Data Table; Power Cord Installation In Furnace J-Box; Bx Cable Installation In Furnace J-Box - Payne PG8MAA Installation And Operating Instructions Manual

Series 140/e single-stage deluxe, induced-combustion 4-way multipurpose gas furnace
Table of Contents

Advertisement

FURNACE
SIZE
045 - 08/024045
045 - 12/036045
070 - 08/024070
070 - 12/036070
070 - 16/048070
090 - 14/042090
090 - 16/048090
090 - 20/080090
110-12/038110
110-16/048110
110-22/088110
135-16/048135
135 -22/088135
155 - 20/060155
Table 7--Electrical
Data
VOLTS-
HERTZ-
PHASE
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
115-60-1
OPERATING
VOLTAGE
RANGE
Maximum*
Minimum*
127
104
127
104
127
104
127
104
127
104
127
104
127
104
127
104
127
104
127
104
127
104
127
104
127
104
127
104
MAXIMUM
UNIT AMPS
5.4
7.0
5.0
6.8
9.5
8.2
10.0
13.6
8.2
10.1
14.8
10.2
14.4
15.0
UNiT
AMPACITY#
7.54
9.50
7.06
9.22
12.60
10.83
13.13
17.61
10.75
13.12
18.99
13.27
18.55
19.33
MAXIMUM
WiRE
LENGTH FT.
(M)$
49 (15)
39 (12)
52 (16)
40 (12)
29 (9)
34 (lO)
28 (9)
32 (8)
34 (1 O)
28 (9)
30 (9)
27 (8)
30 (9)
29 (9)
MAXIMUM
FUSE OR
CKT 8KR
AMPSI"
15
15
15
15
15
15
15
20
15
15
20
15
20
20
MINIMUM
WIRE
GAUGE
14
14
14
14
14
14
14
12
14
14
12
14
12
12
Permissible limits of the voltage
range at which the unit operates satisfactorily.
# Unit ampacity
= 125 percent of largest operating
component's
full load amps plus 100 percent of all other potential
operating components'
(EAC, humidifier,
etc.) full load amps.
1- Time-delay
type is recommended.
$ Length shown is as measured
1 way along wire path between
unit and service panel for maximum 2 percent voltage drop.
12. Complete
electrical
box wiring
and installation.
Connect
line voltage
leads as shown
in Fig. 26. Use best practices
(NEC) for wire bushings,
strain relief, etc.
13. Reinstall
cover
to J-Box.
Do
not pinch
wires
between
cover and bracket.
POWER
CORD
INSTALLATION
IN FURNACE
J-BOX
NOTE:
Power
cords
must
be
able to handle
the
electrical
requirements
listed
in
Table
7.
Refer
to
power
cord
manufacturer's
listings.
1. Remove
cover from J-Box.
2. Route listed power cord through
7/8-in.
(22 mm) diameter
hole in J-Box.
3. Secure
power
cord to J-Box
bracket
with
a strain
relief
bushing
or a connector
approved
for the type of cord used.
4. Secure field ground
wire to green ground
screw on J-Box
bracket.
5. Connect
line voltage
leads as shown
in Fig. 26.
6. Reinstall
cover
to J-Box.
Do
not pinch
wires
between
cover and bracket.
BX CABLE
INSTALLATION
IN FURNACE
J-BOX
1. Remove
cover from J-Box.
2. Route
BX cable into 7/8-inch
(22 mm) diameter
hole in
J-Box.
3. Secure
BX cable to J-Box
bracket
with
connectors
ap-
proved
for the type of cable used.
4. Secure field ground
wire to green ground
screw on J-Box
bracket.
5. Connect
line voltage
leads as shown
in Fig. 26.
6. Reinstall
cover
to J-Box.
Do
not pinch
wires
between
cover and bracket.
22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg8jaa

Table of Contents