Tower-To-Rack Conversion Kit Option - HP ProLiant DL G6 User Manual

Table of Contents

Advertisement

If removed, install the BBWC battery pack or the FBWC capacitor pack
12.
pack or the FBWC capacitor
Install fan 5.
13.
Install the access panel.
14.
Do one of the following:
15.
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
o
Power up the server (on page 22,
16.

Tower-to-rack conversion kit option

The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a rack
model server and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:
Rack-mounting hardware kit
Rack bezel
Front video connector cable
T-15 screws (6)
Screwlocks (2)
This document
In addition to the items supplied in the conversion kit, you will also need the following items:
A Torx T-15 screwdriver (clipped to the rear panel of the server)
A 3/16-in nut driver
To convert a tower model server to a rack model server:
Power down the server (on page 22).
1.
Disconnect all rear panel cabling.
2.
pack" on page 86).
"Powering up and configuring the
("Installing the BBWC battery
server" on page 40).
Hardware options installation 89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml370 g6Proliant dl370 g6

Table of Contents