Hp Nc524Sfp Dual Port 10Gbe Module Option - HP ProLiant DL G6 User Manual

Table of Contents

Advertisement

Power up the server (on page 22,
18.

HP NC524SFP Dual Port 10GbE Module option

When installed on the HP NC375i Integrated Quad Port Multifunction Gigabit Server Adapter, the HP
NC524SFP Dual Port 10GbE Module provides two 10G NIC connectors for server I/O.
If more than one HP NC375i adapter is installed in the server, always install the HP NC524SFP module on
the adapter in expansion slot 10.
The HP NC375i adapter supports four NIC connectors at a time. When the HP NC524SFP module is
installed, two 1G NIC connectors on the adapter are unavailable.
IMPORTANT:
10GbE Server Adapter are installed in the server, only expansion slot 1 has Wake On LAN
capability.
To install the component:
Power down the server (on page 22).
1.
Disconnect the network cables.
2.
Do one of the following:
3.
Open or remove the tower bezel, as needed
o
Extend the server from the rack (on page 24).
o
Remove the access panel (on page 25).
4.
Remove fan 5 (on page 26).
5.
If installed, remove the BBWC battery pack or the FBWC capacitor pack (on page 27).
6.
Remove the air baffle (on page 28).
7.
Using a T-15 Torx screwdriver, remove the 10G NIC adapter blank.
8.
Save the retaining screw.
Open the expansion board slot retainer.
9.
"Powering up and configuring the
When both an HP NC524SFP module and an optional HP NC522SFP Dual Port
server" on page 40).
("Open or remove the tower
Hardware options installation 80
bezel" on page 22).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml370 g6Proliant dl370 g6

Table of Contents