Installing The Trusted Platform Module Board - HP ProLiant DL G6 User Manual

Table of Contents

Advertisement

HP is not liable for blocked data access caused by improper TPM use. For operating instructions, see the
encryption technology feature documentation provided by the operating system.

Installing the Trusted Platform Module board

WARNING:
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.
WARNING:
internal system components to cool before touching them.
Power down the server (on page 22).
1.
Do one of the following:
2.
Open or remove the tower bezel, as needed
o
Extend the server from the rack (on page 24).
o
Remove the server from the rack, if necessary.
3.
Place the server on a flat, level work surface.
4.
Remove the access panel (on page 25).
5.
Remove fan 5 (on page 26).
6.
If installed, remove the BBWC battery pack or the FBWC capacitor pack (on page 27).
7.
Remove the air baffle (on page 28).
8.
Remove the fan cage (on page 29).
9.
CAUTION:
the TPM security rivet. Upon locating a broken or disfigured rivet on an installed TPM,
administrators should consider the system compromised and take appropriate measures to ensure
the integrity of the system data.
Install the TPM board. Press down on the connector to seat the board
10.
page 13).
To reduce the risk of personal injury, electric shock, or damage to the equipment,
To reduce the risk of personal injury from hot surfaces, allow the drives and the
Any attempt to remove an installed TPM from the system board breaks or disfigures
("Open or remove the tower
("System board
Hardware options installation 100
bezel" on page 22).
components" on

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml370 g6Proliant dl370 g6

Table of Contents