Installing The Eight-Bay Sff Drive Cage (Bay 3) - HP ProLiant DL G6 User Manual

Table of Contents

Advertisement

Route and connect the drive cage bay 2 power cable (BP2) and the SAS cables to the drive cage
12.
backplane.
Install the fan cage.
13.
Install the air baffle.
14.
If removed, install the BBWC battery pack or the FBWC capacitor pack
15.
pack or the FBWC capacitor
Install fan 5.
16.
Install the access panel.
17.
Do one of the following:
18.
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
o
CAUTION:
all bays are populated with either a component or a blank.
Install the hard drives and hard drive blanks.
19.
Power up the server (on page 22,
20.

Installing the eight-bay SFF drive cage (bay 3)

To configure this option for drive cage bay 3, locate the three jumper pins on the backplane. Move the
jumper from pins 1 and 2 to pins 2 and 3.
For more information, see "Drive cage jumper configuration settings (on page 21)."
Power down the server (on page 22).
1.
Do one of the following:
2.
Open or remove the tower bezel, as needed
o
Extend the server from the rack (on page 24).
o
Remove the access panel (on page 25).
3.
Remove fan 5 (on page 26).
4.
pack" on page 86).
To prevent improper cooling and thermal damage, do not operate the server unless
"Powering up and configuring the
("Installing the BBWC battery
server" on page 40).
("Open or remove the tower
Hardware options installation 61
bezel" on page 22).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml370 g6Proliant dl370 g6

Table of Contents