Remove the expansion slot cover.
8.
Install the expansion board.
9.
Close the expansion slot retainer.
10.
Connect any internal cables to the expansion board.
11.
Install the air baffle.
12.
If removed, install the BBWC battery pack or the FBWC capacitor pack
13.
pack or the FBWC capacitor
Install fan 5.
14.
Install the access panel.
15.
Do one of the following:
16.
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
o
Connect any external cables to the expansion boards.
17.
pack" on page 86).
("Installing the BBWC battery
Hardware options installation 79