Kohler KD 625/3 Workshop Manual page 30

Air cooled, direct injection
Hide thumbs Also See for KD 625/3:
Table of Contents

Advertisement

4
Disassembly / Reassembly
29
30
31
32
- 30 -
Unscrew the screw fastening the clamp of the high-pressure pipe
using a 4 mm hexagon screwdriver.
Remove the forked bracket fixing the injector to the cylinder head
using a 5 mm hexagon screwdriver (see photo 29 - 30).
These operations are necessary when checking injector calibration or
when replacing it.
The fixing bracket screws must be tightened to 10 Nm using a tor-
que wrench.
KD Workshop Manual_cod. ED0053029350_1° ed_ rev. 00

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rd 626/3Kd 626/3

Table of Contents