CHAPTER 4: Installing Components
54
The cable from the first mini-SAS connector (port 0-3) on the mezzanine
board should be connected to the mini-SAS connector on the backplane
of the top cage (Cage #0), and the cable from the second mini-SAS
connector (port 4-7) on the mezzanine board should be connected to the
mini-SAS connector on the backplane of the bottom cage (Cage #1)
Connect to Mezzanine Board
Return the chassis to its upright position, if necessary.
8
Follow the instructions in
9
To remove a mezzanine board:
Follow the instructions in
1
page
28. Make sure that you turn off the server, then unplug the power
cord(s) and all other cables connected to the server.
Follow the instructions in
2
Set the chassis on its side to make it easier to work on.
3
Remove the cables from the mezzanine board.
4
Push aside the plastic retaining tabs (1) and pull the mezzanine board (2)
5
straight up and out of the mezzanine board slot.
Return the chassis to its upright position, if necessary.
6
Follow the instructions in
7
"Closing the server case" on page
"Preventing static electricity discharge" on
"Opening the server case" on page
"Closing the server case" on page
www.gateway.com
30.
29.
30.