4. Operation
Control Overview
`çåíêçä=lîÉêîáÉï
There are several ways to control the LED-PRO:
•
•
•
mçïÉêJré=fåáíá~äáò~íáçå
After connecting power to the LED-PRO, locate the power switch on the back of the
chassis, and turn the power ON. The LED button lights, and the display shows a series of
initialization screens. The screens vary depending upon the last state of the system:
•
•
•
pí~åÇ~êÇ=_ççíìé
While the main board is initializing, the following screens are shown on the display
•
Figure 4-1. Initialization Screen 1
•
Figure 4-2. Initialization Screen 2
26
The front panel is available for status and control using the display, the ADJUST
knob and the two menu "navigation" buttons (SEL and ESC). In conjunction with
other dedicated buttons, these controls enable you to configure the system, to
adjust all system parameters, and to utilize the "wizards."
The unit can be controlled remotely via RS-232 or Ethernet interface. In
Appendix B, refer to the
"LED-PRO Remote
for remote control command details.
The Director Toolset is a software application that is used to detect the LED-
PRO and provide it with information concerning the LED tiles. Operations of the
Director Toolset are not covered in this guide. Please refer to the "Director
Toolset User's Guide" for more information.
Standard Bootup
Bootup in Ethernet Mode
Bootup with a Stored LOGO
Initialization Screen 1 displays the "Program Loading" message.
P r o g r a m L o a d i n g
Please Wait
Initialization Screen 2 displays the "Transferring" message.
T r a n s f e r r i n g t o
m a i n p r o g r a m
Commands" section on page 128
LED-PRO • User's Guide