A S S E M BLY ST E P 4
ORANGE HARDWARE BAG CONTENTS :
HAND RAIL TRANSITION PIECE
HAND RAIL BASE COVER
SCREW (K)
Y O U'RE F I N I SH ED!
SCREW (K)
30 mm
Qty: 4
A Open ORANGE HARDWARE BAG.
B Attach HAND RAIL BASE COVER to
the base frame using
2 SCREWS (K).
C Slide HAND RAIL TRANSITION
PIECE and HANDLEBAR into
CONSOLE.
C Repeat on other side.
D Be sure all bolts and screws are
tightened and secured on the
treadmill.
11