First Power-Up Following Installation

1) The Fluorometer comes preconfigured from the TIA factory
using the supplied fiber optic cable and fluorescence probe.
Preconfiguration at TIA involves application specific filter sets
and optimization of detection capabilities. Preconfiguration
should insure turnkey operation upon arrival.
2) Make sure that the probe is located in complete darkness. Stray
light in the measurement area will result in an increased baseline
response level and will limit the effective monitoring capabilities
of the instrument.
3) Immerse the fluorescence probe in a process sample. TIA
recommends that the setup sample be the process
background.
4) Make sure that all fiber optic cables are properly connected
5) Make sure that all electrical connections to the transmitter have
been made according to the wiring diagram.
6) Power up the unit.
7) Allow the lamp to flash for a minimum of 1 hour before
completing the rest of the initialization sequence.
8) After lamp warm-up and stabilization, the REF DET LED
should have a steady green output. The MSR DET LED may
have a flashing yellow, flashing green, or a solid green output.
The indicator LEDs are located to the left of the display along
the outer edge of the Fluorometer housing.
9) Perform Mode 2 initialization
a) Press the INT PRESET, located in the upper left hand corned
of the Fluorometer, for at least eight (8) seconds. Please see
Section 2 for a description of Mode 2 operation.
b) Both the REF and MSR DET LEDs exhibit solid green or
flashing green output. c) The value on the display is
fluorescence level in the process. If the sample is the
background material, this is your background fluorescence
level.