Installing The Micro-Fuel Cell; Testing The System - Teledyne 3010TA Operating Instructions Manual

Trace oxygen analyzer
Table of Contents

Advertisement

Oxygen Analyzer
3.5
The Micro-Fuel Cell is not installed in the cell block when the
instrument is shipped. It must be installed during initial installation.
Once it is expended, the Micro-Fuel Cell will need to be replaced. The
cell could also require replacement if the cell is exposed to air for too long,
or if the instrument has been idle for too long.
When the micro-Fuel Cell needs to be installed or replaced, follow the
procedures in chapter 5, Maintenance, for removing and installing cells.
3.6
After The Control Unit and the Analysis Unit are both installed and
interconnected, and the system gas and electrical connections are complete,
the system is ready to test. Before plugging either of the units into their
respective power sources:
Power up the system, and test it as follows:
1. Repeat the Self-Diagnostic Test as described in Part I, chapter 4,
Figure 3-6: FET Series Resistance

Installing the Micro-Fuel Cell

Testing the System

Check the integrity and accuracy of the gas connections. Make
sure there are no leaks.
Check the integrity and accuracy of the electrical connections.
Make sure there are no exposed conductors
Check that sample pressure is between 3 and 40 psig, according
to the requirements of your process.
section 4.3.5.
Part II: Analysis Unit
Part II: 3-7

Advertisement

Table of Contents
loading

Table of Contents