HP ML350T06 - E5520 Sff Us Svr Setup And Installation Manual page 81

Installation guide
Table of Contents

Advertisement

Hardware Options Installation
6. Connect the data cable (1) and power cable (2) to the back of the drive.
2
1
Figure 3-14: Connecting the data and power cables
7. Connect the data cable into a SCSI controller channel (secondary SCSI channel
shown in Figure 3-14).
HP ProLiant ML350 Generation 3 Server Setup and Installation Guide
3-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml350 generation 3

Table of Contents