HP ML350T06 - E5520 Sff Us Svr Setup And Installation Manual page 72

Installation guide
Table of Contents

Advertisement

Hardware Options Installation
3. Loosen the two thumbscrews located at the top of the front chassis (1).
4. Slide the access panel back about 1.5 cm (0.5 inches) (2).
5. Lift and remove the panel.
Figure 3-6: Removing the access panel
3-8
2
HP ProLiant ML350 Generation 3 Server Setup and Installation Guide
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml350 generation 3

Table of Contents