CAUTION: If a third-party rack is used, observe the following additional
requirements to ensure adequate airflow and to prevent damage to the equipment:
·
·

Locating Materials

Locate the following materials that were shipped with the server:
·
Keyboard (not included with the rack model)
·
Mouse (not included with the rack model)
·
Power cord
·
Documentation and software packs inside the shipping box
·
Rack-mounting hardware (rack model only)
In addition to the supplied items, you may need:
·
Torx T-15 screwdriver
·
Hardware options
·
Ethernet cable
·
Operating system or application software
·
Uninterruptible Power Supply (UPS) or Power Distribution Unit (PDU)
·
Monitor
HP ProLiant ML350 Generation 3 Server Setup and Installation Guide
Front and rear doors: If the 42U server rack includes closing front and rear
doors, ensure 5,350 sq cm (830 square inches) of holes are evenly distributed
from top to bottom to permit adequate airflow (equivalent to the required 64
percent open area for ventilation).
Side: The clearance between the installed rack component and the side panels
of the rack must be a minimum of 7 cm (2.75 inches).
Overview of Server Installation
2-11