Cabling the Server

After the cable management arm is installed, cable the server by following these
procedures:
1. Plug all external cables into the server.
2. If you installed a switchbox into the rack, route the CPU-to-switchbox cables to
the switchbox.
3. Bundle all of the cables, including the power cable, then secure them to the cable
management arm using the Velcro strips.
Figure 2-18: Routing and securing the cables
4. Extend the bundled cables down the rack cable channel.
HP ProLiant ML350 Generation 3 Server Setup and Installation Guide
Overview of Server Installation
2-27