Server Board Installation And Upgrades; Tools And Supplies Needed; Before You Begin; Emissions Disclaimer - Intel S875WP1 - EATX MBD 875 P4 DDR-2CH SATA RAID VID GETH Product Manual

Product guide
Table of Contents

Advertisement

2 Server Board Installation and Upgrades

Tools and Supplies Needed

*
Phillips
(cross head) screwdriver (#1 bit and #2 bit)
Jumper removal tool or needle nosed pliers
Pen or pencil
Antistatic wrist strap and conductive foam pad (recommended)

Before You Begin

Emissions Disclaimer

To ensure EMC compliance with your local regional rules and regulations, the final configuration
of your end system product may require additional EMC compliance testing. For more information
please contact your local Intel Representative.
See "Regulatory and Integration Information" on page 107 for product Safety and EMC regulatory
compliance information. This is an FCC Class A device. Integration of it into a Class B chassis
does not result in a Class B device.

Warnings and Cautions

These warnings and cautions apply throughout this chapter. Only a technically qualified person
should configure the server board.
WARNING
Hazardous conditions, devices & cables: Hazardous electrical
conditions may be present on power, telephone, and communication cables.
Turn off the server and disconnect the power cord, telecommunications
systems, networks, and modems attached to the server before opening it.
Otherwise, personal injury or equipment damage can result.
Server Board Installation and Upgrades
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S875wp1-e

Table of Contents