Installation; Downtime After Installation; Levelling The Tumble Dryer - Miele PDR 908 HP Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Installation

Ensure that no closeable door, sliding
door, or an oppositely hinged door is
installed that would hinder the door
of the tumble dryer being opened in
any way.

Downtime after installation

Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
switching it on.

Levelling the tumble dryer

The appliance must stand perfectly level
on all four feet to ensure safe and proper
operation.
The screw feet can be adjusted to com-
pensate for unevenness in the floor.
This tumble dryer is not suitable for
building under.
Never block the ventilation slots on
the tumble dryer. Do not block the
gap between the bottom of the
tumble dryer and the floor with plinth
facings, deep pile carpet etc. This
would hinder a sufficient flow of air to
the tumble dryer.
Installation
83

Advertisement

Table of Contents
loading

Table of Contents