Figure 10. The Hierarchy of Main, Branch and Sub-branch PDUs

Setting Up Branch PDUs

This section describes how to connect the control wires and set the Main/Branch Switch (S2)
in each PDU to set up different branch PDU configurations. Use the figure that matches your
desired configuration.
To connect two or more branch or sub-branch PDUs to an upstream PDU, connect the control
wires in parallel.
Ensure that '+' terminals are only connected to other '+' terminals and '
terminals are only connected to other '
are connected together, the circuits will not function properly.
OPERATING DESCRIPTIONS
NOTE

' terminals. If a '+' and '
HP E1135C POWER DISTRIBUTION UNIT Rev. C

'

' terminal