Yamaha SR250G Service Manual page 60

Table of Contents

Advertisement

Installation
Reinstalling the tie and tube can be ac-
complished
by reversing
the
disassembly
procedure.
The only cifference in procecure
would be right after the tu:
has been in-
stsllec, but before the tire has baen com-
piotely slipped onto the rim, momentarily in-
flate the tube. This removes any creases that
might exist. Release the air snd continue
with reassembly, Also, right after the tire has
boon completely s\/ppod onto tne rim. chock
to make sure that the stem cones oul of the
hole in the rim ata right angle to the rim
Finally. inflate the tire
mean
Yokoharra | Yekehame
200-18-aPHR | 120/00. 16 63"
Stendaed tie
od io orsesure
'Upto BO ks (193 ln
1Bhge
Omen'
teaoe
ep)
(ae pen
ka (90BIe~ — oe
4g (36 hae
(@7aximum 930)
orgie?
tg speed nding
te woe asp"
'Tora welane ofacessores et. ecectng motwrerce
If a tire tread shows cross-wise lines, it
means that the tire is worn to its limit. Re-
place the tire
worrna cats
DRIVE CHAIN AND SPROCKETS
NOTE: ——
Please vefer vo General mainterance and
Lubrication charts for additional information
Drive Sprocket
With
the left crankcase cover removed pro-
ceed as follows
+ , Romove che sprocket securing bolts.
Remove the holder plate and drive
sprocket,
2. Check sprocket wear. Replace if weer
decreases tooth width as shown
3. Replace if tooth wear shows a pattem
such as that in thy /ilustration, or as
precaution and common sense dictate.
4. Tighten the securing boits
Drive Sprocket
Securing Bolt Torque
1.0 m-kg (7.2 ft-o)
Tawan
3 Rober
2 Comer
4, Sproceat

Advertisement

Table of Contents
loading

Table of Contents