Installation and mounting
5.3 Base area and foundation
In order to be able to secure the station, the following drill holes must be available for the
fastening points:
①
②
③
④
Figure 5-4 Top view of the base area
78
Cable bushing for dispenser cable
Cable bushing for power supply cord
Example recesses in the foundation walls for cable routing
Fastening points
Operating Instructions, 11/2023, A5E50556539-AG
SICHARGE D