Removing Slot Brackets; Ocp (Open Compute Project) Modules; Installing The Ocp Module - Fujitsu PRIMERGY CX2550 M6 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Expansion cards and OCP mezzanine cards
6.3.2

Removing slot brackets

Upgrade and Repair Unit
(URU)
Tools:
Phillips PH1 / (+) No. 1 screw driver
Removing a slot bracket
▶ Remove the two screws.
▶ Remove the controller from the mounting tabs on the slot bracket.
6.4

OCP (Open Compute Project) modules

6.4.1

Installing the OCP module

Upgrade and Repair Unit
(URU)
Tools:
For Mellanox OCP: T6 Torx screw driver
Preliminary steps
"Disabling the boot watchdog" on page
▶ Locate the desired server node with the ID button.
"Shutting down the server node" on page
▶ Remove all external cables from the server node.
"Removing server nodes from the server enclosure" on page
98
62.
Upgrade and Maintenance Manual
Hardware: 5 minutes
Hardware: 5 minutes
45.
45.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2560 m6

Table of Contents