2� Brickwork wall thickness, follow: 1E Installations
of reserved access panel
2� 施工假墙厚度,按照步骤 1E:预留检修口安装
A. Press from front : Brickwork wall thickness 8~69mm from
the front of tank.
A. 前按:假墙厚度距水箱正面 8~69mm。
B. Remote installation: Brickwork wall thickness follow: 1E
Installations of reserved access panel, remote installation
part of normal pneumatic faceplate reserved access panel.
B. 远程安装:假墙厚度见 1E:预留检修口安装,常规气动面
板预留检修口的远程安装部分。
3� After completing the brickwork of the wall, remove
protection of inlet hole and drainage hole
3� 砌墙后,取出进、排水口防护
When finishing the brickwork of the wall, take out the EPE
block, and eliminate unwanted mask with a sharp knife, if
there is mask.
Note: 1. Reserve access panel at front of the tank in remote
installation.
2. Do not remove and discard the mask cover before
installation of the water tank faceplate.
Foreign matters and dusts should be prevented
from entering the water tank during construction.
如图砌完墙后。将 EPE 挡块取出,然后根据需要,有方外罩
时用水口刀把方外罩多余的长度锯掉。
注:1. 远程安装时,水箱的前方预留检修口。
2. 方外罩遮板,安装水箱面板前请勿移除和废弃。
避免施工过程中异物及灰尘进入水箱。
1G� Installation of wall-hung toilet
1G� 挂墙座便器安装
1. Install the big and small leak-proof gaskets on the inlet
pipe and drainage pipe, and then install them to the
corresponding pipes on the toilet.
1. 如图将座便器的排污管、进水管装上大、小防漏胶圈,然后
装在座便器的相对应管道。
2. As shown, mark A1, A2 on the drainage pipe and the inlet
pipe at the back side of the toilet with a ruler and a pencil.
2. 如图用直尺放在座便器后面的排污管、进水管用铅笔做标记
线 A1,A2。
1476533-K2-A
Small Leak-proof Gasket
小防漏胶圈
Drainage Pipe
排污管
Big Leak-proof Gasket
大防漏胶圈
Inlet Pipe
进水管
Drainage Pipe
排污管
-15-
Mask
方外罩
Cover
遮板
EPE Block
EPE
Inlet Pipe
进水管
挡块
A2