Unit Install Preparation - Trane TAMXB0A24V21DB Installation, Operation And Maintenance Manual

Variable speed air handlers convertible 2 - 5 ton
Table of Contents

Advertisement

Unit Install Preparation

1.
Check for damage and report promptly to the carrier any damage
found to the unit.
Note: If the unit must be transported in a horizontal position, it must
be laid on its back (marked "REAR" on carton).
Note: After unit is removed from the carton, verify coil is pressurized.
Carefully remove the liquid line plug. If no pressure is released,
check for leaks.
Note: Remove the cardboard from the bottom of the blower. Cut the
tie wrap and remove the foam shipping block located at the
motor.
Note: Remove the ANA foam found between the blower and
evaporator coil.
18-GJ89D1-1F-EN
ANA
Foam
7

Advertisement

Table of Contents
loading

Table of Contents