Unit Install Preparation - Trane TAMXA0A24V21DA Installer's Manual

Link communicating / variable speed outdoor compatible convertible air handler
Table of Contents

Advertisement

Unit Install Preparation

1.
Check for damage and report promptly to the carrier any damage
found to the unit.
Note: If the unit must be transported in a horizontal position, it must
be laid on its back (marked "REAR" on carton).
Note: After unit is removed from the carton, verify coil is pressurized.
Carefully remove the liquid line plug. If no pressure is released,
check for leaks.
Note: Remove the cardboard from the bottom of the blower. Cut the
tie wrap and remove the foam shipping block located at the
motor.
Note: Remove the ANA foam found between the blower and
evaporator coil.
18-GJ89D1-1D-EN
ANA Foam
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents