Section 3. Unit Preparation - Trane GAF2A0A36S31EE Installer's Manual

60 hz convertible air handlers 1-1/2 - 3 ton. black epoxy coil, standard coil.
Table of Contents

Advertisement

Section 3. Unit Preparation

3.1 Prepare The Unit For Installation
STEP 1 - Check for damage and report promptly to
the carrier any damage found to the unit.
Note: If the unit must be transported in a horizontal
position, it must be laid on its back (marked "REAR"
on carton).
Note: Remove the cardboard from the bottom of the
blower. Cut the tie wrap and remove the foam block
located at the motor.
Note: After the unit is removed from the carton,
release pressure from the coil to verify coil is
pressurized and leak free.
3.2 Unit Accessories
Accessory Number
BAYECAA05LG1
BAYECAA08LG1
BAYECAA10LG1
BAYSFSCABAA
BAYRETFLGAA
TASB175SB
BAYFRKIT100
BAYBRFBX100
BAYWMKIT001
BAYLVKIT100A
BAYECPDKIT1A
BAYAHTXV1836
BAYCNDPIP01A
1 GAF2A0A18-36 Cabinet is one piece 17.5" wide
Table 3.1
Description
Electric Heater, 5kW, Lugs, 24V Control, 1 Ph
Electric Heater, 8kW, Lugs, 24V Control, 1 Ph
Electric Heater, 10kW, Lugs, 24V Control, 1 Ph
Supply Duct Flange A1 1
Return Duct Flange A
Plenum Stand with Sound Baffle A
Front Return Kit
Bottom Return Filter Box
Wall Mount Kit
Low Voltage Conduit Entry Kit
Pull Disconnect Kit
R-22 TXV Conversion Kit
3/4" PVC Threaded Pipe Kit foam seal (10 per box)
Fits Cabinet Size 1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
5