Refrigerant Line Brazing - Trane TAMXB0A24V21DB Installation, Operation And Maintenance Manual

Variable speed air handlers convertible 2 - 5 ton
Table of Contents

Advertisement

Refrigerant Line Brazing

Table 13. Braze the Refrigerant Lines
1.
Remove Heater, Coil, and Line Set panels.
Important: Do NOT unseal coil refrigerant connection stubs
until ready to make connections.
Important: Heat Sensitive Sensors. The Gas Temperature
Sensor must be removed or a wet rag must be
wrapped around the suction line between the
Sensor and the braze joint to protect it from
failure due to overheating.
2.
Remove the sealing plug from the indoor coil suction
line.
3.
Remove the sealing plug from the indoor coil liquid line.
This coil is pressurized with 8–12 psig of dry air. Do not
stand directly in front of the coil connections when removing
sealing plugs.
4.
Connect, but do not braze field line set to indoor coil.
a.
Allow a minimum of 1.5 inches of refrigerant line set
before using an elbow coupling.
Important: Service access to the auxiliary heater must
remain unobstructed.
24
Heater
1
Panel
Line Set
2
Panel
Coil
3
Panel
1.5" MIN
18-GJ89D1-1F-EN