Mounting Control Boards; Setting Switches And Mounting Optional Boards; Figure 3.3 Mp20 Switch Setting; Table 3.7 Mp20 Switches - Samsung OfficeServ 7200 Installation Manual

Hide thumbs Also See for OfficeServ 7200:
Table of Contents

Advertisement

CHAPTER 3. Ошибка! Используйте вкладку "Главная" для применения 제목 1 к тексту, который должен здесь
отображаться.

3.2 Mounting Control Boards

This section describes the procedures for setting switches, mounting optional boards,
mounting the boards on a slot, and how to connect between the MP20/MP20S and LCP.

3.2.1 Setting Switches and Mounting Optional Boards

MP20
The MP20 features switches used for optimizing the board to the user requirements and
system configuration. The procedure for setting switches and mounting optional boards is
as follows:
1) Set the SW1 through SW4 of the S2 switch to Off.
2) Set the SW6 through SW8 of the S2 switch according to user requirements.
Switch
S2
SW1~SW4
SW6~SW8
3-6
1

Figure 3.3 MP20 Switch Setting

Table 3.7 MP20 Switches

Description for setting switches
For domestic use, set all switches to Off.
Sets the number of digits for C.O./extension lines and extension groups.
SW6-On: 4 digits for C.O. line Off: 3 digits for C.O. line
SW7-On: 4 digits for an extension group Off: 3 digits for an extension
group
SW8-On: 4 digits for an extension number Off: 3 digits for an extension
number
S2
Off
8
On
© SAMSUNG Electronics Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents