Chapter 2. Installing Cabinets; Procedure For The System Installation; Selecting Installation Method - Samsung OfficeServ 7200 Installation Manual

Hide thumbs Also See for OfficeServ 7200:
Table of Contents

Advertisement

CHAPTER 2.
This chapter describes how to install an OfficeServ 7200 cabinet on the floor, inside rack or
on a wall depending on the installation environment.

2.1 Procedure for the System Installation

The procedure of system installation is as follows. (Refer to 'Figure 3.1 Front Panel
Configuration')
1) Install the OfficeServ 7200 cabinet on the floor, inside rack or on the wall depending
on the installation environment.
2) Earth to the ground lug behind the basic cabinet.
3) Put the MP20/MP20S board into the slot 0 of the basic cabinet. If there is an expansion
cabinet, mount the LCP board into the slot 0 of the expansion cabinet.
4) Mount interface boards into the universal slots (slot 1 through slot 5).
5) Connect an external battery with proper capacity.
6) Connect AC 220~240 V input power.

2.2 Selecting Installation Method

The OfficeServ 7200 cabinet can be installed on the floor, inside a 19-inch rack or on a
wall depending on the number of cabinets and environment of the installation area.
Caution for Installation
Only a trained service staff can install the OfficeServ 7200.
The equipment intended only for installation in a RESTRICTED ACCESS
LOCATION.
© SAMSUNG Electronics Co., Ltd.
Installing Cabinets
OfficeServ 7200 Installation Manual
2-1

Advertisement

Table of Contents
loading

Table of Contents