Manually Starting A Discharge Operation; Resetting Ip Settings - Beko QWIK-PURE 15 Installation And Operation Manual

Table of Contents

Advertisement

QWIK-PURE
®

9.2.8 Manually starting a discharge operation

Illustration
3 sec

9.2.9 Resetting IP settings

Illustration
78 | 124
Description / explanation
1. Press and hold the Service button for 3 seconds.
0 The piston in the FRC will close the condensate
inlet from the pressure relief chamber into the
FRC.
0 The measuring chamber is supplied with auxiliary
air at timed intervals.
0 The condensate is passed through the filter 
cartridges.
2. If the filling level in the measuring chamber has 
fallen below the Low Level (LL) sensor, the discharge 
operation will stop.
0 The measuring chamber is no longer pressurised
with auxiliary air.
0 The piston in the FRC will open the condensate
inlet from the pressure relief chamber into the
FRC.
Description / explanation
3 sec
1. Press and hold down the ON/OFF button for
3 seconds.
Installation and operation manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qwik-pure 30Qwik-pure 60Qwik-pure 90

Table of Contents