Installation and operation manual
6.2 Assembly work
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks
must have been completed.
Tools
•
Adjustable spanner
•
Water pump pliers
•
Spirit level
1.
Select and set up the place of installation according to the specifications in section "4.8
Assembly conditions" on page 41.
2.
The condensate inlet line provided by the customer must be depressurised and locked and
tagged out to prevent unintentional pressurisation.
3.
Have the necessary tools and materials ready.
4.
Prepare the required connection materials suitable for the pressure and temperature range.
5.
Check the product for damage. Only use the product in an undamaged state.
INFORMATION QWIK‑PURE
i
Prerequisites
•
Sealing material (e.g. PTFE tape)
for sealing the condensate
connections provided by the
customer
•
Hose clamps
•
Hose for condensate and
compressed air
•
Vaseline supplied
Preparatory tasks
15 ... 60 assembly!
®
Start assembling the QWIK‑PURE
The collector of the QWIK‑PURE
Skip steps 1 through 7.
Material
15 ... 60 from step 8.
®
15 ... 60 is delivered ready for installation.
®
QWIK-PURE
Protective equipment
Always to be worn:
®
45 | 124