Operation; Attachment Of Implement; Installation Of Pto Driven Implement - Bad Boy 1025H Operator's Manual

Hide thumbs Also See for 1025H:
Table of Contents

Advertisement

ATTACHMENT OF IMPLEMENT

INSTALLATION OF PTO DRIVEN IMPLEMENT

1. Attach the implement to the trac-
tor.
2. Lift the implement off the ground.
3. Stop the engine and put the PTO
shift lever in the neutral position.
4. After opening the PTO cover, con-
nect the universal joint shaft while
turning the PTO shaft by hand so
as to align the splines.
5. To check the PTO shaft is se-
cured, check if the pin is returned
to the original position by pulling
the universal joint shaft.
6. Close the PTO cover.
7. Adjust the PTO shift lever accord-
ing to the working speed.
8. Check if the safety shields are in
place and working environment is
normal. If the master safety shield
is not installed, do not operate the
PTO. Stop the engine to check the
PTO shaft and its guards Repair
or lubricate if required.
9. The PTO shaft should not be inter-
fered by any surrounding parts.
1025H.indb 17
1025H.indb 17
8. Check if the safety shields are in
place and working environment is
normal. If the master safety shield
is not installed, do not operate the
PTO. Stop the engine to check the
PTO shaft and its guards Repair
or lubricate if required.
9. The PTO shaft should not be inter-
fered by any surrounding parts.

OPERATION

CAUTION
If someone is entangled in the
rotating part, it can cause a fa-
tal injury. Always wear protec-
tive gear and install the safety
shields and guards to the drive
line. Don't wear loose clothing.
Do not remove the installed
protective cover of the PTO
drive shaft without permission.
If working with this protective
cover removed, it can cause
a severe injury. Refer to the
warning decal on the cover.
2021-07-06 오전 11:07:48
2021-07-06 오전 11:07:48
5
17
-
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents