▶ Land leveling pattern
● The land leveling work may be
performed after crushing soil or
not.
● The vehicle speed can be set fast-
er when performing the land level-
ing work with soil crushed already.
● When working in a wet field, fill
the field with a sufficient amount of
water so that the trace of plowing
cannot be seen.
● The border shown in the figure
should be set a little narrower than
two times of one plowing width.
● Refer to the alternating returning
pattern for other details.
1025H.indb 23
1025H.indb 23
● Turning:
Finish
(15) (11)
(8)
(12)
OPERATION
Moving direction
(14)
(10)
(4)
(5)
(9) (13)
(3)
(6)
(2)
(7)
(1)
Start
A
5
23
-
Reverse driving
5
A: Border
2021-07-06 오전 11:07:49
2021-07-06 오전 11:07:49