Peak Load Cut-Out; Communication Module; Operating Data - Miele PW 6163 Operating And Installation Instructions

Commercial washing machine
Table of Contents

Advertisement

Optional modules (depending on country)
Cleaning and
maintenance of
the dispensing
system
52
Rinse the dispensing system through with warm water every 2 weeks,
or before shutting the dispenser pumps down for any length of time,
to avoid the system getting clogged up and corroded.
Also rinse out the siphons with water.
Put the siphons in a container of warm water (40-50 °C).
Use dispenser calibration to activate each pump until the
dispensing system is rinsed through.
Check the connection points, hoses, dispensing sockets and
washers for leaks.

Peak load cut-out

When the peak-load function is activated, the heating is deactivated
and the programme stopped.
Activate the peak-load function.
The following message appears in the display:
1
Cottons
Prog. stopped. Peak load cut-out.
Programme will continue automatically.
The programme is resumed automatically when the peak-load
function finishes.

Communication module

The machine can be connected to a PC (personal computer) using
the communication module.
The slot for the module is located on the back of the machine.
An Editor programme is available for this from Miele.

Operating data

The module Operating data can be used to read or delete Operating
data before a programme start or after programme end by pressing
the  "Operating data" button.
1
Cottons hygiene
2
Cottons
Cottons Intensive
3
Press the  "Operating data" button.
When the  button is pressed, the following appears in the display:
90 °C
60
°C
60
°C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pw 6243Pw 6323

Table of Contents