Dismantling - Kohler KD103V20 Operation And Maintenance Manual

Table of Contents

Advertisement

Control and operation

Dismantling

4.6 Dismantling
The dismantling must be carried out or supervised by a trained and qualified staff.
Prepare the dismantling as follows:
u According to local regulations, clarify the means and quality of the dismantling process.
u Disconnect the electrical power supply.
u Remove any electronic control or electrical connections.
u Drain all fluids.
u Remove any coolant, lubricants and fuel connections.
u Collect and dispose of waste, coolant, lubricants and fuel.
u Disassemble the component or engine according to general mechanics procedures.
76
© 2022 by Kohler Co. All rights reserved.
KD103V20 33521030901_2_1 EN_US
2022-09

Advertisement

Table of Contents
loading

Table of Contents