Upper Cable Adjustment - Weider Platinum 800 WESY75740 User Manual

Table of Contents

Advertisement

UPPER CABLE ADJUSTMENT

After completing the assembly of the resistance system, the tension on the upper cable (A) will need to be
adjusted. Also, the upper cable can stretch slightly when it is first used. When this occurs, the upper cable ten-
sion will need to be readjusted. Follow the steps below to adjust the upper cable tension.
1. Connect the two Tension Gauges (116, 82)
together using the magnet.
2. Plug in the resistance system as described in
PLUGGING IN THE RESISTANCE SYSTEM on
page 20. Use the Console (not shown) to adjust
the resistance setting of the system to the highest
setting, as described in step 2 on page 20.
Squeeze the upper cable (A) together near a
Large Pulley (14). Hook the ends of the Tension
Gauges (116, 82) around the upper cable as
shown. Do not hook the ends of the Tension
Gauges around the Tether (70); which is
attached to the back of the Pulley Bracket
(10).
Slide the Tension Gauges (116, 82) next to the
Large Pulley (14) as shown in the inset drawing.
3. Locate the 3/8" x 38mm Tension Screw (13) on
each end of the Resistance Bar (9). Alternately
tighten each Screw one turn at a time until the
two Tension Gauges (116, 82) are pulled apart by
the upper cable (A).
The upper cable tension is now properly adjusted.
1
116
82
2
10
14
3
13
15
Magnet
116
A
82
70
A
82
14
9
116
82
A
116
A

Advertisement

Table of Contents
loading

Table of Contents