UPPER CABLE ADJUSTMENT

After completing the assembly of the resistance system, the tension on the Upper Cable (121) will need to be
adjusted. Also, the Upper Cable can stretch slightly when it is first used. When this occurs, the upper cable ten-
sion will need to be readjusted. Follow the steps below to adjust the upper cable tension.
1. Connect the two Tension Gauges (118, 119)
together using the magnet.
2. Plug in the resistance system as described in
PLUGGING IN THE RESISTANCE SYSTEM on
page 17. Use the Console (not shown) to adjust
the resistance setting of the system to the highest
setting, as described in step 2 on page 17.
Squeeze the Upper Cable (121) together near a
Large Pulley (14). Hook the ends of the Tension
Gauges (118, 119) around the upper cable as
shown. Do not hook the ends of the Tension
Gauges around the Tether (70), which is
attached to the back of the Pulley Bracket
(10).
Slide the Tension Gauges (118, 119) next to the
Large Pulley (14) as shown in the inset drawing.
3. Locate the 3/8" x 38mm Tension Screw (117) on
each end of the Resistance Bar (9). Alternately
tighten each Screw one turn at a time until the
two Tension Gauges (118, 119) are pulled apart
by the Upper Cable (121).
The upper cable tension is now properly adjusted.
1
118
119
2
10
14
3
117
12
Magnet
118
121
119
70
121
119
14
9
118
119
121
118
121

Advertisement

Table of Contents
loading

Table of Contents