Section 3 • Scheduled Maintenance Procedures
CHECKLIST A PROCEDURES
A-2
Perform Pre-operation
Inspection
Note: Genie specifications require that this
procedure be performed every 8 hours or daily,
whichever comes first.
Completing a pre-operation inspection is essential
to safe machine operation. The pre-operation
inspection is a visual inspection performed by the
operator prior to each work shift. The inspection is
designed to discover if anything is apparently
wrong with a machine before the operator performs
the function tests. The pre-operation inspection
also serves to determine if routine maintenance
procedures are required.
Complete information on how to perform this
procedure is available in the appropriate
Genie Z-34/22 IC Operator's Manual on your
machine.
3 - 8
A-3

Perform Function Tests

Note: Genie specifications require that this
procedure be performed every 8 hours or daily,
whichever comes first.
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is
put into service. A malfunctioning machine must
never be used. If malfunctions are discovered, the
machine must be tagged and removed from
service.
Complete information on how to perform this
procedure is available in the appropriate
Genie Z-34/22 IC Operator's Manual on your
machine.
Z-34/22 IC
July 2007
REV A
Part No. 128267