8 Putting The Unit Into Service; Nameplate; Filling Out The Start-Up Operation Report - Henny Penny FlexFusion FPE-615 Installation Manual

Electric platinum combi with smoker box
Hide thumbs Also See for FlexFusion FPE-615:
Table of Contents

Advertisement

8 Putting the unit into service
INFORMATION
Prerequisite Electrical connection made

8.1 Nameplate

8.2 Filling out the Start-up operation report

Enter the data on the nameplate.
SN:
Electrical connection
Designation
Item no.:
If the unit is not put into service immediately after being connected and the
function check, all inspections must be repeated.
Water connection made
Wastewater connection made
Exhaust air connection made ​ ​ ( if required by the customer)
Function checked successfully
Housing closed
1. Instruct operator.
2. Fill out the Start-up operation report.
l
k
Image: Nameplate information
a Manufacturer
b Serial number
c Type number
d Protection class
e Frequency
f Barcode
General information
Type
(if available)
Installation instructions
Putting the unit into service
a
b
j
g
h
i
g Connection pressure for water
h Year of manufacture
i Type of connection
j Electrical connected load
k Manufacturer's web address
l Certificate
c
d
e
f
Yes
No
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flexfusion fpe-621Flexfusion fpe-115Flexfusion fpe-121

Table of Contents