Putting the unit into service
Obvious damage to the device?
What and where?
Unit levelled?
Is it necessary to secure the device against tipping or slipping?
If so, how was it secured?
secured against tipping
Screwed to floor
Glued to floor
Electrical connection made properly?
Potential equalization
Potential-free contact
Electrical connections made properly?
Fault current protection installed immediately upstream of this unit?
Measured supply voltage:
Set transformer voltage
T1: blue 0 V | red
Kitchen guiding system connected properly?
Set temperature unit
°C
Date and time set?
current software version
set installation altitude
0 — 999 m (3277 ft)
2000 m (6560 ft) — 2499 m (8197 ft)
Voltage set in the control.
Voltage:
Set volume unit
ml
fl.oz. (U.S.)
Power optimization system set?
On
50
General information
General information
Electrical connection
(V)
V; T2/T3: blue 0 V | red
Kitchen guiding system
Basic control setting
V
Installation instructions
secured against shifting
Screwed to floor
Glued to floor
Power optimization system
V
°F
1000 m (3280 ft) — 1999 m (6557 ft)
2500 m (8200 ft) or higher
fl.oz. (Imperial)
Off
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No